Multitex Wall Coating System product range
Wall Coating Products
BASE RANGE | PRIMER RANGE | DECORATIVE RANGE | FINAL COAT RANGE
 

Most of the products offered by Multitex for the Multitex Wall Coating System are designed for a specific wall surface and purpose and are spread across four sections, namely BASE RANGE , PRIMER RANGE , DECORATIVE RANGE AND FINAL COAT RANGE .

Step 1, Base Range (Base Coat):

The preparation stage, are designed especially for SPECIFIC SURFACES and for the preparation of the substrate to form a base coat suitable to provide the ideal base for the subsequent application of a variety of top coats including Multitex Decorative Textures and Final Range coatings.

Product
Description
Package Coverage
Area
Thickness Drying time Application
Method
Download
PDS
Download
MSDS

Dry Mix Renders                per Bag/Pail

Fine Render Bag: 20Kg 4 - 5 SqM 2 - 4mm 1 day per mm Trowel On-Steel
Trowel/Foam Float
click here click here
Medium Render Bag: 20Kg 3.5 - 4 SqM 3 - 5mm 1 day per mm Trowel On-Steel
Trowel/Foam Float
click here click here
Coarse Render Bag: 20Kg 3 - 3.5 SqM 3 - 5mm 1 day per mm Trowel On-Steel
Trowel/Foam Float
click here click here
Hi Build Render Bag: 16Kg 1.5 - 2 SqM 6 - 10mm 1 day per mm Trowel On-Steel
Trowel/Foam Float
click here click here
Fibre Reinforced
Render
Bag: 20Kg 4 - 4.5 SqM 3 - 4mm 1 day per mm Trowel On-Steel
Trowel/Foam Float
click here click here
Board Render Bag: 20Kg 4 - 4.5 SqM 3 - 4mm 1 day per mm Trowel On-Steel
Trowel/Foam Float
click here click here
Flexy Patch Bag: 17Kg 45 linear
Meter
60mm width 1 day per mm Spatula/Steel
Trowel/Sander (FG Tape)
click here click here
Filling Patch Pail: 5Ltr Depends on
gap
N/A 1 day per mm Spatula/Steel
Trowel/Sander (FG Tape)
click here click here
Tilt-Up Patch Bag: 8Kg Depends on
gap
N/A 1 day per mm Spatula/Steel Trowel/
Sander (FG Tape)
click here click here

Dry Mix Textures

Fine Texture Bag: 20Kg 8 - 10 SqM Grain Size 24 hours Trowel On-Steel
Trowel/Foam Float
click here click here
Coarse Texture Bag: 20Kg 6 - 8 SqM Grain Size 24 hours Trowel On-Steel
Trowel/Foam Float
click here click here

Wet Mix

Multi Patch
"Coarse"
Plastic Pail:15Ltr 8 - 9SqM 2 - 4mm 24 hours Trowel On-Steel
Trowel/Foam
or PS Float
click here click here
Multi Joining Patch Plastic Pail:15Ltr 60linear
Meter
60mm width 24 hours Steel Trowel/
Spatula (FG Tape)
click here click here
Multi Break Plastic Pail:15Ltr

120-160 SqM

N/A N/A LP Spray click here click here
Multi Grip Plastic Pail:15Ltr 0.75L/BAG
or 100 SqM
N/A 24 hours Mix in Render
/Roller/Brush
click here click here

* SqM > Square metre or M2, WFT > Wet Film Thickness,  mm > millimetre

* Drying time mentioned per coat is the recoat time @ 25C and 50% relative humidity

* Full curing time for all products> minimum 7 days @ 25C and 50% relative humidity

Step 2, Primer Range (Primer Coat):

The primer coat, are designed to act as a protective primer undercoat for the MULTITEX coating system and are applied to the substrate to unify the substrate porosity, reduce consolidates suction and improve the overall performance of the base coat render, they ensure maximum inter-coat adhesion and provide excellent key for following Multitex Decorative Textures and Final Range coatings.

Product
Description
Package Coverage
Area
Thickness *Drying time Application
Method
Download
PDS
Download
MSDS

Primer Range                     per pail

Multi Prime Plastic
Pail:15Ltr
100-120
SqM
WFT
75-100uM
2 hours Roller/Brush/Spray click here click here
Marble Prime Plastic
Pail:15Ltr
100 SqM WFT N/A 4 hours Roller/Brush click here click here

* SqM > Square metre or M2, WFT > Wet Film Thickness,  mm > millimetre

* Drying time mentioned per coat is the recoat time @ 25C and 50% relative humidity

* Full curing time for all products> minimum 7 days @ 25C and 50% relative humidity

Step 3, Decorative Range (Texture Coat):

The Decorative Texture Coat, are designed to provide the desired look in different profiles of textures and finishes, other than colour and looks they also improve the integrity, flexibility and long term durability of the entire system.

Product
Description
Package Coverage
Area
Thickness Drying time Application
Method
Download
PDS
Download
MSDS

Trowel Grade                          per pail

Trowel Fine Plastic Pail:15Ltr 14 - 15 SqM Grain Size 24 hours Steel Trowel/Plastic Float click here click here
Trowel Medium Plastic Pail:15Ltr 12 - 13 SqM Grain Size 24 hours Steel Trowel/Plastic Float click here click here
Trowel Coarse Plastic Pail:15Ltr 9 - 10 SqM Grain Size 24 hours Steel Trowel/Plastic Float click here click here
Scratch 1mm Plastic Pail:15Ltr 10 - 12 SqM Grain Size 24 hours Steel Trowel/Plastic Float click here click here
Scratch 2mm Plastic Pail:15Ltr 8 - 9 SqM Grain Size 24 hours Steel Trowel/Plastic Float click here click here
Granular Marble Plastic Pail:15Ltr 3 - 4 SqM Grain Size 24 hours Steel Trowel click here click here

Roll-On Grade

Roll-on Fine Plastic Pail:15Ltr 14 - 15 SqM Grain Size 24 hours Texture Roller Fine/Medium click here click here
Roll-on Coarse Plastic Pail:15Ltr 8 - 10 SqM Grain Size 24 hours Texture Roller Coarse click here click here

* SqM > Square metre or M2, WFT > Wet Film Thickness,  mm > millimetre

* Drying time mentioned per coat is the recoat time @ 25C and 50% relative humidity

* Full curing time for all products> minimum 7 days @ 25C and 50% relative humidity

Step 4, Final Coat Range (Top Coat):

These products generally used at Step 4, the Durable Top Coat, are designed to provide exterior performance and durability, they act as a protective coating for the base system configuration providing, other than colour, flexibility, resistance to dirt pick up, resistance to atmospheric pollution, Ultra Violet, moisture ingress and salt penetration.

Product
Description
Package Coverage
Area
Thickness Drying time Application
Method
Download
PDS
Download
MSDS

Final Coat Range                  per pail

Membrane Plastic
Pail:15Ltr
Fine roller 25SqM
Coarse roller 20 SqM
Stipple Size 4-5 hours Texture Roller Fine/Coarse click here click here
Nap roller 60
SqM
WFT
175-200uM
2 hours Nap Roller
Multitex Shield
(Low Sheen
& Matt)
Plastic
Pail:15Ltr
80 - 90SqM WFT 150uM 2 hours Roller/Brush/Spray click here click here

* SqM > Square metre or M2, WFT > Wet Film Thickness,  mm > millimetre

* Drying time mentioned per coat is the recoat time @ 25C and 50% relative humidity

* Full curing time for all products> minimum 7 days @ 25C and 50% relative humidity

 

2011 www.multitex.com.au  |  Designed by Professional Computers